MMP Structural Engineering -
403.264.8495 (Calgary)
705.737.9286 (Barrie)
8am - 5pm (Mon - Fri)
Calgary (Head Office): #205 1170 Kensington Cr NW Calgary, AB
Barrie (East Canada Office): #101B 135 Bayfield St., Barrie ON
Our design approach emphasizes on incorporating structural engineering principles & theoretical design determinants, the industry standards and on-site practices while ensuring smooth collaboration with other disciplines.
Years in the Industry
Since 1978
Ongoing Projects
 
Projects Under Construction

Founded in 1978, MMP Engineering is recognized as one of Canada's premier structural engineering companies. Our dedication, teamwork, and knowledge has enabled us to successfully deliver time effective qualitative design solutions and consulting services to all our clients (architects, engineers, developers, municipalities, state agencies, and institutions) from coast to coast in Canada, U.S.A., Caribbean Islands, South America, Europe, and Asia. A testament of our collaboration and commitment is a $70.0 million Children’s Hospital in Nizhnevartovsk, Russia, and a housing project in the west Siberian Oilfields of Russia.

MMP Engineering has been involved in a great variety of projects encompassing almost all phases of traditional engineering practice. The variety of building types allows us to apply solutions and ideas for almost any new structure as we can draw on the lessons of many variety of building types and variety of construction methods including steel, concrete, wood, masonry and pre-cast to name a few.

A great diversity in project locations has given us the experience in designing structures to suit a variety of different local condition, including the extreme cold and high wind area and high seismic zone.

For more than thirty years MMP Engineering has been dedicated in structural design for all types of building in North America and Asia including high wind load and major seismic load regions with complicated soil conditions.

News and Updates

  • New horizon mall – All concrete work successfully completed in June 2017.
  • ATCO Commercial centre – Construction completed in 2017. Some elements require revision to incorporate minor practicality-based changes.
  • Skypointe Senior’s Community – 95% of the concrete work finished in May 2017. Pours for entrance canopies etc. make the other 5% of the work that remains. Design of phase 2 (commercial complex) commenced in June 2017.
  • MGH Assisted Facility
Read more