MMP Structural Engineering -
403.264.8495 (Calgary)
705.737.9286 (Barrie)
8am - 5pm (Mon - Fri)
Calgary (Head Office): #205 1170 Kensington Cr NW Calgary, AB
Barrie (East Canada Office): #101B 135 Bayfield St., Barrie ON

Groves of Varsity

This ± $100.0 million project will have cast-in-place concrete buildings with the senior home, medical centre and market condo. The foundation for the project consists of stone columns to improve the soil bearing capacity.

Read more

This project is one of the best shopping mall in North America, sitting at the crossroads of two national freeways. The total developed area is more than 3.5 million square foot.

Read more

This 45-million project has a high school and recreation centre for the town of Strathmore. This school has an Olympic size basketball court, pool, gym, and theatre. The recreation centre has a pool, waterslide, and gym facility.

Read more

This 120-million project has two 12-storey hotel towers, casino, and conference centre with the underground parking. The last phase of the project has a private residence club. The private residence club has high-end condo with swimming pool at the top of the building. The foundation for the project consists of stone columns to improve the soil bearing capacity.

Read more
Page 2 of 2 12